WBIW.com News - state

Brought to you by WBIW News and Network Indiana

Deck Overlay Operation Underway At SR 39 White River Bridge

Last updated on Monday, July 16, 2018

(MORGAN COUNTY) - Weddle Brothers construction crews will begin applying a thin polymeric bridge deck overlay, weather permitting, atop the two center lanes of State Road 39 spanning White River late tonight, July 16. The Evansville contractor set barricades Friday afternoon, July 13.

Single-lane traffic is being maintained in either direction across the1,074-foot-long concrete structure located just south of S.R. 67 approaching Martinsville. The Evansville contractor set barricades Friday afternoon (JULY 13). Single-lane traffic is being maintained in either direction across the1,074-foot-long concrete structure located just south of S.R. 67 approaching Martinsville.

This work is part of a 6-bridge $548,548 project contracted by the Indiana Department of Transportation for installing 3/8-inch polymeric epoxy overlays on structures in Brown, Johnson, Morgan and Monroe Counties. The overlays are intended to extend service life of the bridges.

The state's project also includes these bridges: S.R. 67 at Lambs Creek--located 1.5 miles southwest of S.R. 39 at Martinsville; S.R. 45 over Cascade Road--located one mile east of S.R. 37 at Bloomington; S.R. 135 over Gnaw Bone Creek--located just south of S.R. 46 in Brown County; the twin bridges over Bluff Creek--located just south of S.R. 144 in Johnson County.

Motorists can learn about highway work zones and other traffic alerts at indot.carsprogram.org, 1-800-261-ROAD (7623) or 511 from a mobile phone.

1340 AM WBIW welcomes comments and suggestions by calling 812.277.1340 during normal business hours or by email at comments@wbiw.com

© Ad-Venture Media, Inc. All Rights Reserved.

Click here to go back to previous page